Keppel Seghers Tuas WTE Plant is a 22 MW waste-fired power plant in Singapore, operated since its commissioning. Ranked #3 of 3 waste plants in Singapore, it contributes 13.92% of the country's total waste capacity of 158 MW. The largest waste plant in Singapore is Tuas South WTE Incineration Plant at 80 MW, making Keppel Seghers Tuas 3.6 times smaller. Nearby plants include Tanjung Bin power station (3244 MW, Coal), Stesen Janakuasa Tanjung Bin (3100 MW, Coal), and Senoko I-VII CCGT Power Plants (2807 MW, Gas). The facility is located in Singapore, approximately 25 km from the city center.
17 years old
Singapore, Asia
- 14. largest of 14 plants in Singapore
- #18,560 worldwide by installed capacity
- #202 of 1,065 Waste plants worldwide
- 0.16% of the installed capacity of Singapore
17 years in operation
Waste fleet average: 23.1 years
Keppel Seghers operates 1 plants totalling 22 MW
24 plants within 100 km, 26,042 MW combined
Source: GEODB
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
Singapore- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.