Sălbatica I is a 70 MW wind power plant in Romania, operated by ENEL GreenPower since 2011. It contributes 4.9% of Romania's total wind capacity of 1,429 MW, which consists of 48 plants. This facility ranks #5 of 48 wind plants in the country. Ranked #5 of 48 wind plants in Romania, Sălbatica I's 70 MW represents 4.9% of the nation's total wind capacity. The largest wind plant in Romania is Fântânele-Cogealac Wind Farm at 600 MW, making Sălbatica I 8.6 times smaller. Nearby plants within 50 km include Fântânele-Cogealac Wind Farm (600 MW, Wind), WPP Cogealac (246 MW, Wind), and Valea Nucarilor (70 MW, Wind). The facility is located in Constanța County, approximately 30 km from the city of Constanța.
15 years old
Romania, Europe
- 41. largest of 158 plants in Romania
- #11,705 worldwide by installed capacity
- #1,056 of 5,731 Wind plants worldwide
- 0.35% of the installed capacity of Romania
15 years in operation
Wind fleet average: 14.4 years
ENEL GreenPower operates 2 plants totalling 140 MW
16 plants within 100 km, 1,964 MW combined
Source: Enel Green Power
Location
Zero Direct Emissions
Sălbatica I is a wind power plant producing approximately 184 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Romania- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.