World Power Plants

Livada Solar Park

SolarRenewableVerified: Feb 2026

Livada Solar Park is a solar power facility in Romania with a capacity of 0 MW. It is ranked #37 of 58 solar plants in Romania and has not been commissioned yet. Its 0 MW capacity accounts for 0% of Romania's total solar capacity of 472 MW. The largest solar plant in Romania is Solaris at 56 MW, making Livada 0 times smaller, as it has no operational capacity. Nearby plants include Solaris (56 MW, Solar), Doba (5.9 MW, Solar), and Satu Mare Solar Park (0 MW, Solar). The facility is located at coordinates 47.8665, 23.0545, in the Satu Mare County region.

Capacity
0 MW
Commissioning Year
2019

7 years old

Owner
CEZ Romania
Location
47.8665°, 23.0545°

Romania, Europe

Context & rankings
  • 84. largest of 158 plants in Romania
  • #38,624 worldwide by installed capacity
  • #10,839 of 11,042 Solar plants worldwide
Age & fleet comparison

7 years in operation

Solar fleet average: 10.4 years

Operator portfolio

CEZ Romania operates 7 plants totalling 0 MW

Regional density

3 plants within 100 km, 62 MW combined

Nearest plant: Satu Mare Solar Park (15.8 km)

Data provenance

Source: Wikidata

Location

Coordinates:: 47.866542, 23.054550
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Livada Solar Park is a solar power plant producing approximately 0 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Solar
Energy Source
Renewable
Country
Romania
Continent
Europe
Data Source
Global Power Plant Database

RomaniaEnergy Profile

158
Total Plants
20.2 GW
Total Capacity
CoalGasHydroNuclear
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.