Lousã II is a 50 MW wind power plant in Portugal, commissioned in 2009. Ranked #19 of 222 wind plants in Portugal, Lousã II's 50 MW represents 1.01% of Portugal's total wind capacity of 4,935 MW. The largest wind plant in Portugal is Alto Douro at 253 MW, making Lousã II 5.06 times smaller. Nearby plants include Pinhal Interior (144 MW, Wind), Pampilhosa da Serra (114 MW, Wind), and Toutiço (102 MW, Wind). The facility is located in the region of Coimbra, approximately 200 km north of Lisbon.
17 years old
Portugal, Europe
- 39. largest of 462 plants in Portugal
- #13,082 worldwide by installed capacity
- #1,297 of 5,731 Wind plants worldwide
- 0.34% of the installed capacity of Portugal
17 years in operation
Wind fleet average: 14.4 years
EDP Renewables operates 118 plants totalling 5,033 MW
129 plants within 100 km, 5,818 MW combined
Source: Energias Endogenas de Portugal
Location
Zero Direct Emissions
Lousã II is a wind power plant producing approximately 131 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Portugal- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.