Satpara Dam is a hydroelectric power plant in Pakistan with a capacity of 0 MW. It is operated by the Water & Power Development Authority and ranks #54 of 63 hydro plants in the country, which have a combined capacity of 43,855 MW. The largest hydro plant in Pakistan is Bunji Dam at 7,100 MW, making Satpara 0 times smaller. Ranked #54 of 63 hydro plants in Pakistan, Satpara contributes 0% to the country's hydro capacity. The largest hydro plant in Pakistan is Bunji Dam at 7,100 MW, making Satpara 0 times smaller. Nearby plants include Hydel Station Ph-III Basho (0.5 MW, Hydro) and Skardu Power House IV (0 MW, Hydro). The facility is located in Skardu District, approximately 150 km from Gilgit.
23 years old
Pakistan, Asia
- 170. largest of 198 plants in Pakistan
- #38,621 worldwide by installed capacity
- #8,284 of 8,493 Hydroelectric plants worldwide
23 years in operation
Hydroelectric fleet average: 42.1 years
Water & Power Development Authority operates 29 plants totalling 26,835 MW
4 plants within 100 km, 48 MW combined
Source: Wikidata
Location
Zero Direct Emissions
Satpara Dam is a hydro power plant producing approximately 0 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Pakistan- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.