Patrind Hydropower Plant— 150 MW Hydroelectric
Ranking as the 89th largest power generation facility in Pakistan, the Patrind Hydropower Plant stands out as a significant contributor to the country's energy landscape. With a capacity of 150 MW, it is one of the smaller players in the hydro segment, holding the 25th position among 63 hydro plants nationwide. This facility, commissioned in 2017 and operated by Star Hydro Power Pvt. Limited, is strategically located near several larger hydropower projects, including the Kohala Hydropower Project, which boasts a capacity of 1124 MW, the Neelum-Jhelum Hydropower Station at 969 MW, and the Suki Kinari Hydropower Project with a capacity of 884 MW. Together, these plants create a robust energy cluster that not only enhances regional energy security but also highlights the importance of hydroelectric power in Pakistan's overall energy mix. The Patrind Hydropower Plant utilizes advanced hydroelectric generation technology, which converts the kinetic energy of flowing water into electrical energy. This clean and renewable energy source plays a crucial role, especially considering that hydro power is the dominant fuel type in the country, contributing to approximately 66% of Pakistan's total capacity of 98,402 MW across 198 plants. Patrind's output represents a modest share of 0.15% of the national capacity, underscoring its role in the broader energy framework while also revealing the vast potential that still exists in the hydro sector. The surrounding energy facilities amplify the importance of the Patrind plant. For instance, the Kohala project not only surpasses Patrind in capacity but also emphasizes the competitive landscape among hydropower facilities in the region. With the current national average capacity per plant being around 496 MW, Patrind's 150 MW output illustrates both its niche position and the challenges smaller plants face in a market dominated by larger entities. As Pakistan continues to expand its energy infrastructure, the Patrind Hydropower Plant, while relatively modest, serves as a vital part of the energy puzzle. The country's reliance on renewable sources like hydroelectric power is set to grow, aligning with global sustainability goals. Given its recent commissioning in 2017, Patrind represents modern advancements in hydropower technology, which not only helps reduce carbon emissions but also supports local economies by providing jobs during both construction and operational phases. Looking forward, the Patrind Hydropower Plant exemplifies the ongoing shift towards sustainable energy production in Pakistan, contributing to the nation's energy independence and environmental stewardship.
9 years old
Pakistan, Asia
- 89. largest of 198 plants in Pakistan
- #8,356 worldwide by installed capacity
- #1,769 of 8,493 Hydroelectric plants worldwide
- 0.15% of the installed capacity of Pakistan
9 years in operation
Hydroelectric fleet average: 42.1 years
Star Hydro Power Pvt. Limited operates 1 plants totalling 150 MW
19 plants within 100 km, 14,988 MW combined
Source: OpenStreetMap
Location
Zero Direct Emissions
Patrind Hydropower Plant is a hydro power plant producing approximately 526 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Pakistan- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.