World Power Plants

Engro Powergen Qadirpur Limited227 MW Natural Gas

GasVerified: Feb 2026

Engro Powergen Qadirpur Limited, positioned as the 67th largest power generation facility in Pakistan, boasts a capacity of 227 MW, playing a vital role in the country's energy landscape. This gas-fired power plant, operated by Engro Energy, contributes to 0.23% of Pakistan's total capacity of 98,402 MW, where hydroelectric power remains the dominant fuel source. Ranking as the 25th largest gas plant out of 46 in the nation, Engro Powergen is crucial in addressing the growing energy demands of Pakistan. The facility utilizes advanced gas turbine technology, which efficiently converts natural gas into electricity, making it an integral part of Pakistan’s strategy to enhance energy security and reduce reliance on traditional fuels. This technological framework allows for rapid power generation, catering to peak demands and ensuring a stable electricity supply. Geographically, the plant is strategically located near several other gas facilities, including the massive Guddu Thermal Power Station (1791.7 MW), TNB Liberty Power Plant (235 MW), Liberty Power Project (232 MW), and Engro Energy Ltd. Karachi (217 MW). This concentration of gas-fired plants within a 50 km radius not only enhances the reliability of the regional grid but also fosters collaboration on energy distribution and resource management. In a broader national context, Pakistan's energy profile includes a total of 198 power generation facilities, with a significant portion relying on hydroelectric power. Engro Powergen’s gas-generated electricity serves as a vital complement to hydro power, especially during dry seasons when water levels may restrict hydroelectric output. The plant's contribution is essential for balancing the energy mix and providing a buffer against fluctuations in renewable generation. Operated by Engro Energy, the plant has been pivotal in supporting the economic growth of the region since its commissioning. Engro Powergen is a testament to the company’s commitment to enhancing Pakistan’s energy sector and addressing its electricity challenges. Looking towards the future, Engro Powergen Qadirpur Limited is expected to play an increasingly important role in Pakistan’s energy transition. As the country seeks to modernize its energy infrastructure and incorporate more sustainable practices, the continued operation of gas plants like Engro Powergen will be essential in achieving a balanced and reliable energy mix.

Capacity
227 MW
Commissioning Year
2015

11 years old

Owner
Engro Energy
Location
28.0262°, 69.3654°

Pakistan, Asia

Context & rankings
  • 67. largest of 198 plants in Pakistan
  • #6,988 worldwide by installed capacity
  • #2,544 of 5,146 Natural Gas plants worldwide
  • 0.23% of the installed capacity of Pakistan
Age & fleet comparison

11 years in operation

Natural Gas fleet average: 26.9 years

Operator portfolio

Engro Energy operates 1 plants totalling 227 MW

Regional density

7 plants within 100 km, 2,950 MW combined

Nearest plant: Liberty Power Project (26.5 km)

Data provenance

Location

Coordinates:: 28.026174, 69.365431
Open in Google Maps
Carbon Footprint490 g CO₂/kWh
Annual CO₂
438.5 Kt
895 GWh/year × 490 g/kWh
Cumulative CO₂
4.82 Mt
Over 11 years of operation
Est. Retirement
2045
19 years remaining
Annual emissions equivalent to
95.3K
cars per year
58.5K
homes per year
19.9M
trees to offset

Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Gas
Energy Source
Non-Renewable
Country
Pakistan
Continent
Asia
Data Source
Global Power Plant Database

PakistanEnergy Profile

198
Total Plants
98.4 GW
Total Capacity
HydroGasCoalOil
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.