Vrutok Hydroelectric Power Plant Macedonia— 150 MW Hydroelectric
The Vrutok Hydroelectric Power Plant stands out prominently in Macedonia's energy sector, ranking as the 2nd largest power generation facility in the country and the foremost among hydroelectric plants. With a capacity of 150 MW, it contributes an impressive 11.01% to Macedonia's total installed capacity of 1,363 MW, showcasing the crucial role of hydroelectric power in a nation where coal remains the dominant fuel. This facility harnesses the kinetic energy of flowing water, employing sophisticated turbine technology to convert it into electricity, a process that is both efficient and environmentally friendly. Positioned within a region that includes several other power plants, Vrutok is surrounded by notable facilities such as the Oslomej Coal Power Plant, which has a capacity of 125 MW, and various hydro plants like Spilje and Kozjak, which contribute 84 MW and 80 MW respectively. This diverse energy mix in the vicinity underscores the importance of both renewable and traditional energy sources in the national grid, providing a balanced approach to energy security. In the context of Macedonia's national energy profile, the reliance on coal for the majority of electricity generation poses sustainability challenges. Nevertheless, the significant hydro capacity provided by Vrutok and its peers plays a critical role in mitigating the environmental impact associated with coal. As such, this plant not only supports local energy needs but also aligns with broader global initiatives aimed at reducing carbon emissions and promoting cleaner energy solutions. Operated by a key player in the Macedonian energy landscape, Vrutok has been serving the grid for several years, reflecting the country's investment in renewable energy infrastructure. Its effective operation enhances the stability and reliability of the regional energy supply, making it a vital component of Macedonia's overall energy strategy. Looking towards the future, Vrutok Hydroelectric Power Plant stands as a testament to the potential of hydroelectric power in addressing both energy demands and environmental concerns. As Macedonia continues to explore pathways for energy diversification, the plant's capacity and operational success will undoubtedly play a significant role in shaping a sustainable energy future for the nation.
21 years old
North Macedonia, Europe
- 2. largest of 12 plants in North Macedonia
- #8,356 worldwide by installed capacity
- #1,769 of 8,493 Hydroelectric plants worldwide
- 11.01% of the installed capacity of North Macedonia
21 years in operation
Hydroelectric fleet average: 42.1 years
ELEM operates 9 plants totalling 1,224 MW
14 plants within 100 km, 2,238 MW combined
Nearest plant: Raven Hydroelectric Power Plant Macedonia (1.8 km)
Source: GEODB
Location
Zero Direct Emissions
Vrutok Hydroelectric Power Plant Macedonia is a hydro power plant producing approximately 526 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
North Macedonia- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.