Hatanagi No.2 is an 87 MW hydro power plant in Japan, operated by Chubu. Ranked #55 of 90 hydro plants in Japan. Its 87 MW accounts for 0.22% of Japan's total hydro capacity of 40,101 MW. The largest hydro plant in Japan is Okutataragi at 1,932 MW, making Hatanagi No.2 22 times smaller. Nearby plants within 50 km include Shin Toyone (1125 MW, Hydro), 佐久間発電所 (350 MW, Hydro), and Sakuma (350 MW, Hydro). The facility is located in Aichi Prefecture, approximately 150 km east of Nagoya.
56 years old
Japan, Asia
- 239. largest of 662 plants in Japan
- #10,856 worldwide by installed capacity
- #2,487 of 8,493 Hydroelectric plants worldwide
- 0.03% of the installed capacity of Japan
56 years in operation
Hydroelectric fleet average: 42.1 years
Chubu operates 18 plants totalling 26,400 MW
38 plants within 100 km, 14,570 MW combined
Source: Chubu Electric Power Company
Location
Zero Direct Emissions
Hatanagi No.2 is a hydro power plant producing approximately 305 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Japan- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.