NUOVA MONTEROTONDO is an 11 MW geothermal power plant in Italy, commissioned in 2002. It is operated in the Tuscany region. Ranked #33 of 34 geothermal plants in Italy, NUOVA MONTEROTONDO contributes 1.13% of Italy's total geothermal capacity of 977 MW. The largest geothermal plant in Italy is Centrale di Valle Secolo at 120 MW, making this facility 10.9 times smaller. Nearby plants within 50 km include Piombino power plant (1280 MW, Gas), PIOMBINO TERMICA (1280 MW, Oil), and Roselectra (386 MW, Gas). The plant is located approximately 100 km southwest of Florence.
24 years old
Italy, Europe
- 302. largest of 542 plants in Italy
- #23,261 worldwide by installed capacity
- #191 of 215 Geothermal plants worldwide
- 0.01% of the installed capacity of Italy
24 years in operation
Geothermal fleet average: 26.9 years
47 plants within 100 km, 5,355 MW combined
Source: ENTSOE
Location
Zero Direct Emissions
NUOVA MONTEROTONDO is a geothermal power plant producing approximately 77 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~38 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Geothermal
- Energy Source
- Renewable
- Country
Italy- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.