BAGNORE 3 is a 19 MW geothermal power plant in Italy, commissioned in 1998. Ranked #16 of 34 geothermal plants in Italy. Its 19 MW represents 1.94% of Italy's total geothermal capacity of 977 MW. The largest geothermal plant in Italy is Centrale di Valle Secolo at 120 MW, making BAGNORE 3 6.3 times smaller. Nearby plants within 50 km include MdC III+IV (44 MW, Solar), BAGNORE 4 (39 MW, Geothermal), and PIANCASTAGNAIO 3 (20 MW, Geothermal). The facility is located in the Tuscany region, approximately 150 km northwest of Rome.
28 years old
Italy, Europe
- 256. largest of 542 plants in Italy
- #20,064 worldwide by installed capacity
- #153 of 215 Geothermal plants worldwide
- 0.01% of the installed capacity of Italy
28 years in operation
Geothermal fleet average: 26.9 years
Enel Green Power operates 360 plants totalling 23,281 MW
73 plants within 100 km, 21,527 MW combined
Source: ENTSOE
Location
Zero Direct Emissions
BAGNORE 3 is a geothermal power plant producing approximately 133 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~38 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Geothermal
- Energy Source
- Renewable
- Country
Italy- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.