Huntstown Phase II is a significant gas-fired power generation facility located in Ireland, boasting a capacity of 404 MW. This power plant plays a crucial role in the national energy mix, providing flexible and efficient electricity generation to meet the demands of the Irish grid. Operated by Viridian, Huntstown Phase II exemplifies modern gas turbine technology, allowing for rapid response to fluctuations in energy demand while maintaining high levels of operational efficiency. The facility is strategically situated at coordinates 53.4119, -6.3261, near Dublin, an area that serves as a major economic hub for the country. Its geographical location not only enhances its accessibility to the national gas pipeline network but also positions it as a key player in supporting the region's energy infrastructure. As Ireland continues to transition towards a low-carbon energy system, Huntstown Phase II stands out due to its ability to provide backup generation during periods of low renewable output, particularly from wind and solar sources. The Irish government has been actively promoting policies aimed at increasing renewable energy uptake, and the flexibility provided by gas-fired plants like Huntstown is essential for balancing the grid. Furthermore, the Huntstown Phase II facility supports Ireland's commitment to reducing greenhouse gas emissions while ensuring energy security. By utilizing natural gas, which emits fewer pollutants compared to coal and oil, the plant aligns with the national objective of fostering a cleaner energy future. Overall, Huntstown Phase II not only represents a pivotal asset in Ireland's energy generation landscape but also highlights the importance of gas power plants in achieving a sustainable energy transition.
23 years old
Ireland, Europe
- 8. largest of 59 plants in Ireland
- #5,218 worldwide by installed capacity
- #1,921 of 5,146 Natural Gas plants worldwide
- 4.73% of the installed capacity of Ireland
23 years in operation
Natural Gas fleet average: 26.9 years
Viridian operates 2 plants totalling 747 MW
15 plants within 100 km, 2,156 MW combined
Source: All Island Project
Location
Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Gas
- Energy Source
- Non-Renewable
- Country
Ireland- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.