PLTU Priok 3 & 4 is a 100 MW coal-fired power plant in Indonesia, operated by PT. Indonesia Power. Ranked #63 of 94 coal plants in Indonesia, this plant's 100 MW represents 0.21% of Indonesia's total coal capacity of 47,804 MW. The largest coal plant in Indonesia is PLTU Paiton I Unit 7 & 8 at 5,355 MW, making PLTU Priok 3 & 4 53.5 times smaller. Nearby plants within 50 km include Muara Tawar Power Plant (2,593 MW, Gas), PLTGU Muara Tawar (2,593 MW, Gas), and PLTGU Muara Karang (1,908 MW, Gas). The facility is located in Jakarta, approximately 25 km west of the city center.
11 years old
Indonesia, Asia
- 149. largest of 297 plants in Indonesia
- #10,042 worldwide by installed capacity
- #2,365 of 2,793 Coal plants worldwide
- 0.09% of the installed capacity of Indonesia
11 years in operation
Coal fleet average: 29.2 years
PT. Indonesia Power operates 7 plants totalling 1,986 MW
52 plants within 100 km, 33,255 MW combined
Source: Indonesia Power Generation
Location
Estimates based on Coal emission factor (820 g CO₂/kWh) and capacity factor (55%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Coal
- Energy Source
- Non-Renewable
- Country
Indonesia- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.