PLTU Pangkalan Bun is a 14 MW coal power plant in Indonesia, operated by PT. Energi Listrik Indonesia. Ranked #86 of 94 coal plants in Indonesia, PLTU Pangkalan Bun's 14 MW represents 0.03% of Indonesia's total coal capacity of 47,804 MW. The largest coal plant in Indonesia is PLTU Paiton I Unit 7 & 8 at 5,355 MW, making PLTU Pangkalan Bun 381 times smaller. There are no nearby plants within 50 km. The facility is located in Central Kalimantan, approximately 200 km from the nearest major city, Palangka Raya.
11 years old
Indonesia, Asia
- 234. largest of 297 plants in Indonesia
- #21,743 worldwide by installed capacity
- #2,698 of 2,793 Coal plants worldwide
- 0.01% of the installed capacity of Indonesia
11 years in operation
Coal fleet average: 29.2 years
PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) operates 1 plants totalling 14 MW
Source: Indonesia Power Generation
Location
Estimates based on Coal emission factor (820 g CO₂/kWh) and capacity factor (55%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Coal
- Energy Source
- Non-Renewable
- Country
Indonesia- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.