PLTU Embalut - Tanjung Batu is a 50 MW coal-fired power plant in Indonesia, operated by PT. Cahaya Fajar Kaltim. Ranked #75 of 94 coal plants in Indonesia, it contributes 0.1% to the country's total coal capacity of 47,804 MW. The largest coal plant in Indonesia is PLTU Paiton I Unit 7 & 8 at 5,355 MW, making this facility 107.1 times smaller. Nearby plants include PLTU Embalut (Coal, 110 MW) and PLTGU Tanjung Batu (Gas, 60 MW). The facility is located in East Kalimantan, approximately 50 km from the city of Balikpapan.
11 years old
Indonesia, Asia
- 184. largest of 297 plants in Indonesia
- #13,085 worldwide by installed capacity
- #2,548 of 2,793 Coal plants worldwide
- 0.05% of the installed capacity of Indonesia
11 years in operation
Coal fleet average: 29.2 years
PT. Cahaya Fajar Kaltim operates 1 plants totalling 50 MW
6 plants within 100 km, 412 MW combined
Source: Indonesia Power Generation
Location
Estimates based on Coal emission factor (820 g CO₂/kWh) and capacity factor (55%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Coal
- Energy Source
- Non-Renewable
- Country
Indonesia- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.