PLTS Gili Trawangan— 0.6 MW Solar
PLTS Gili Trawangan is a 0.6 MW solar power plant in Indonesia, operated by Perusahaan Listrik Negara. Ranked #2 of 5 solar plants in Indonesia. Its 0.6 MW accounts for 23.03% of Indonesia's 3 MW total solar capacity. The largest solar plant in Indonesia is Pembangkit Listrik Tenaga Surya at 1 MW, making PLTS Gili Trawangan 1.67 times smaller. Nearby plants include PLTU Jeranjang (90 MW, Coal) and Ampenan (56.284 MW, Oil). The facility is located on Gili Trawangan Island, approximately 40 km from Mataram.
Indonesia, Asia
- 273. largest of 297 plants in Indonesia
- #38,531 worldwide by installed capacity
- #10,822 of 11,042 Solar plants worldwide
Perusahaan Listrik Negara operates 9 plants totalling 2,155 MW
9 plants within 100 km, 1,244 MW combined
Source: OpenStreetMap
Location
Zero Direct Emissions
PLTS Gili Trawangan is a solar power plant producing approximately 1 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
Indonesia- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.