PLTA Sutami— 103 MW Hydroelectric
PLTA Sutami is a 103 MW hydroelectric power plant located in Indonesia, operated by PT Pembangkitan Jawa Bali. The facility generates electricity from hydropower, contributing to Indonesia's renewable energy resources since its commissioning. It ranks as the 24th largest hydro plant in Indonesia, which has a total of 66 hydro plants with a combined capacity of 7,874 MW. With 103 MW, PLTA Sutami represents 1.31% of the country's total hydro capacity. The largest hydro plant in Indonesia, Upper Cisokan Pumped Storage Power Plant, has a capacity of 1,040 MW, making PLTA Sutami approximately 9.9% the size of that facility. Hydropower is an essential part of Indonesia's energy mix, providing about 7% of the total electricity generation. The development of hydroelectric plants like PLTA Sutami supports the country's push for renewable energy. The facility is located in East Java, approximately 150 km from Surabaya.
28 years old
Indonesia, Asia
- 147. largest of 297 plants in Indonesia
- #9,877 worldwide by installed capacity
- #2,258 of 8,493 Hydroelectric plants worldwide
- 0.1% of the installed capacity of Indonesia
28 years in operation
Hydroelectric fleet average: 42.1 years
PT Pembangkitan Jawa Bali operates 10 plants totalling 11,561 MW
19 plants within 100 km, 3,663 MW combined
Source: OpenStreetMap
Location
Zero Direct Emissions
PLTA Sutami is a hydro power plant producing approximately 361 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Indonesia- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.