Golang - Pamekasan— 2.7 MW Hydroelectric
Golang - Pamekasan is a 2.7 MW hydroelectric power plant in Indonesia, operated by PLN - Java Bali Generation Unit / PT. PJB. Ranked #60 of 66 hydro plants in Indonesia, it represents 0.03% of Indonesia's total hydro capacity of 7,874 MW. The largest hydro plant in Indonesia is Upper Cisokan Pumped Storage Power Plant at 1,040 MW, making Golang - Pamekasan 385.2 times smaller. Nearby plants include PLTU Pacitan (630 MW, Coal), Pacitan Power Plant (630 MW, Coal), and Pacitan power station (630 MW, Coal). The facility is located in East Java, approximately 150 km from Surabaya.
Indonesia, Asia
- 259. largest of 297 plants in Indonesia
- #32,791 worldwide by installed capacity
- #7,207 of 8,493 Hydroelectric plants worldwide
PLN - Java Bali Generation Unit / PT. PJB operates 13 plants totalling 2,274 MW
8 plants within 100 km, 1,969 MW combined
Source: Indonesia Power Generation
Location
Zero Direct Emissions
Golang - Pamekasan is a hydro power plant producing approximately 9 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Indonesia- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.