Tandur First is a 50 MW solar power plant in India, operational since its commissioning. Ranked #83 of 875 solar plants in India, its 50 MW accounts for 0.15% of India's total solar capacity of 33,174 MW. The largest solar plant in India is Bhadla solar park at 2,245 MW, making Tandur First 44.9 times smaller. Nearby plants within 50 km include VASAVADATTA CEMENT (50.7 MW, Coal), Sadashivpet ES (50 MW, Solar), and Zaheerabad (50 MW, Solar). The facility is located in Telangana, approximately 100 km from the nearest major city, Hyderabad.
8 years old
India, Asia
- 703. largest of 1,805 plants in India
- #13,082 worldwide by installed capacity
- #819 of 11,039 Solar plants worldwide
- 0.01% of the installed capacity of India
8 years in operation
Solar fleet average: 10.4 years
Tata Power operates 163 plants totalling 24,126 MW
68 plants within 100 km, 1,602 MW combined
Source: Wiki-Solar
Location
Zero Direct Emissions
Tandur First is a solar power plant producing approximately 79 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
India- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.