World Power Plants

Bavadi Barsingha - Giriraj Solar Power Plant36.3 MW Solar

SolarRenewable

Bavadi Barsingha - Giriraj Solar Power Plant is a 36.3 MW solar facility in India, operated by Giriraj Enterprises. Ranked #223 of 875 solar plants in India, this plant's 36.3 MW accounts for 0.11% of India's total solar capacity of 33,174 MW. The largest solar plant in India is Bhadla solar park at 2,245 MW, making Bavadi Barsingha 61.9 times smaller. Nearby plants within 50 km include Bhadla solar park (2,245 MW, Solar), BhSP3 (560 MW, Solar), and BhSP1 (420 MW, Solar). The facility is located in Rajasthan, approximately 600 km from the city of Jaipur.

Capacity
36.3 MW
Commissioning Year
Owner
Giriraj Enterprises
Location
27.4387°, 72.3245°

India, Asia

Context & rankings
  • 882. largest of 1,805 plants in India
  • #15,662 worldwide by installed capacity
  • #1,391 of 11,042 Solar plants worldwide
  • 0.01% of the installed capacity of India
Operator portfolio

Giriraj Enterprises operates 2 plants totalling 43 MW

Regional density

110 plants within 100 km, 6,977 MW combined

Nearest plant: Manchitiya Symphony (2 km)

Data provenance

Source: Lingandwi

Location

Coordinates:: 27.438700, 72.324500
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Bavadi Barsingha - Giriraj Solar Power Plant is a solar power plant producing approximately 57 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Solar
Energy Source
Renewable
Country
India
Continent
Asia
Data Source
Global Power Plant Database

IndiaEnergy Profile

1,805
Total Plants
513.9 GW
Total Capacity
CoalGasHydroSolar
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.