Les Mées II is a 12.4 MW solar power plant in France, commissioned in an unspecified year. Ranked #58 of 773 solar plants in France, Les Mées II's 12.4 MW represents 0.25% of France's total solar capacity of 5,029 MW. The largest solar plant in France is Cestas at 301 MW, making Les Mées II 24 times smaller. Nearby plants within 50 km include SISTERON (214 MW, Hydro), ORAISON (187 MW, Hydro), and CURBANS (139 MW, Hydro). The facility is located in the Provence-Alpes-Côte d'Azur region, approximately 150 km northwest of Nice.
14 years old
France, Europe
- 484. largest of 2,195 plants in France
- #22,389 worldwide by installed capacity
- #3,331 of 11,039 Solar plants worldwide
- 0.01% of the installed capacity of France
14 years in operation
Solar fleet average: 10.4 years
Energie Solaire France operates 24 plants totalling 74 MW
163 plants within 100 km, 4,383 MW combined
Source: Wiki-Solar
Location
Zero Direct Emissions
Les Mées II is a solar power plant producing approximately 20 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
France- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.