GAEC de la Thorinere— 0.15 MW Biomass
GAEC de la Thorinère is a 0.15 MW biomass power plant in France, commissioned in 2017. Ranked #152 of 163 biomass plants in France. Its 0.15 MW represents 0.01% of France's total biomass capacity of 1,053 MW. The largest biomass plant in France is Port-Est bioenergy power plant at 210 MW, making GAEC de la Thorinère 1,400 times smaller. Nearby plants within 50 km include Gonfreville (16.31 MW, Wind), Saint-Amand (13.8 MW, Wind), and Rully (12 MW, Wind). The facility is located in the Normandy region, approximately 180 km west of Paris.
9 years old
France, Europe
- 2,157. largest of 2,195 plants in France
- #38,584 worldwide by installed capacity
- #1,460 of 1,487 Biomass plants worldwide
9 years in operation
Biomass fleet average: 20.5 years
85 plants within 100 km, 7,599 MW combined
Source: OpenStreetMap
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
France- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.