Felletin is a 3.49 MW biomass power plant located in France. It is one of 163 biomass plants in the country, contributing to the renewable energy sector. Ranked #57 of 163 biomass plants in France, this plant's capacity represents 0.33% of France's total biomass capacity of 1,053 MW. The largest biomass facility in France is Port-Est bioenergy power plant at 210 MW, making Felletin 60.1 times smaller. Nearby plants within 50 km include Mazet (56 MW, Hydro), Le Bourg-d'Hem (13.7 MW, Hydro), and Chambonchard (12 MW, Wind). The facility is located in the Auvergne-Rhône-Alpes region, approximately 30 km from Clermont-Ferrand.
14 years old
France, Europe
- 1,464. largest of 2,195 plants in France
- #31,635 worldwide by installed capacity
- #1,033 of 1,487 Biomass plants worldwide
14 years in operation
Biomass fleet average: 20.5 years
Dalkia operates 46 plants totalling 459 MW
77 plants within 100 km, 1,438 MW combined
Source: Open Power System Data
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
France- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.