Yunnan Baoshan Songshanhekou— 168 MW Hydroelectric
Ranked as the 1308th largest power generation facility in China, Yunnan Baoshan Songshanhekou holds a modest capacity of 168 MW, making it an essential yet minor player in the country's vast energy landscape. As the 257th largest hydro plant out of approximately 1000 in China, its significance lies not only in its capacity but also in its contribution to the heavily coal-dominated national energy profile, where coal remains the primary fuel source. Yunnan Baoshan Songshanhekou's generation technology leverages hydroelectric power, utilizing the natural flow of water to generate electricity sustainably, which aligns with China's increasing focus on diversifying its energy sources and reducing carbon emissions. Located in a region dotted with other hydro plants, it is situated approximately 50 kilometers from Sujiahekou, a larger hydro facility with a capacity of 315 MW, showcasing the area's potential for hydroelectric energy generation. Other nearby plants include Yunnan Yingjiang Zhina River 2nd Level Phase 1 and Phase 2 (36 MW), Yunnan Yingjiang Binglang River Mengnai (24 MW), Yunnan Gaohe River 3rd Level (14 MW), and Yunnan Yingjiang Zhina River 1st Level (14 MW), all of which collectively contribute to the regional energy matrix. In the context of China's overall energy profile, which comprises 4430 power generation facilities and a staggering total capacity of 1,603,494 MW, Yunnan Baoshan Songshanhekou represents a mere 0.01% of national capacity. However, its role as a hydroelectric facility is crucial for balancing the grid, particularly as China pushes towards greater renewable energy integration. The plant is operated by a local entity and has been in operation since its commissioning, contributing to the regional economy through job creation and energy supply. Looking forward, Yunnan Baoshan Songshanhekou stands as a testament to the potential of hydroelectric power in China, especially as the country strives to meet its renewable energy targets amid the global shift towards sustainability.
11 years old
China, Asia
- 1,308. largest of 4,431 plants in China
- #8,016 worldwide by installed capacity
- #1,656 of 8,493 Hydroelectric plants worldwide
- 0.01% of the installed capacity of China
11 years in operation
Hydroelectric fleet average: 42.1 years
Yunnan Power Grid Company operates 3 plants totalling 304 MW
25 plants within 100 km, 1,021 MW combined
Source: UNFCCC CDM Registry
Location
Zero Direct Emissions
Yunnan Baoshan Songshanhekou is a hydro power plant producing approximately 589 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
China- Continent
- Asia
- Data Source
- Global Power Plant Database