Qianan Tengzi 2nd Phase is a 49 MW wind power plant in China, operated since its commissioning year is not specified. Ranked #90 of 833 wind plants in China. Its 49 MW represents 0.1% of China's total wind capacity of 50,905 MW. The largest wind plant in China is Gansu Wind Farm at 6,000 MW, making Qianan Tengzi 2nd Phase 122 times smaller. Nearby plants within 50 km include Datang Changshan power station (660 MW, Coal) and Jilin Qianan Shuizi Phase 1 (49 MW, Wind). The facility is located in Jilin Province, approximately 300 km northeast of Beijing.
10 years old
China, Asia
- 1,942. largest of 4,431 plants in China
- #13,724 worldwide by installed capacity
- #1,415 of 5,731 Wind plants worldwide
10 years in operation
Wind fleet average: 14.4 years
China Longyuan Power Group Corporation operates 48 plants totalling 2,451 MW
25 plants within 100 km, 2,072 MW combined
Source: UNFCCC CDM Registry
Location
Zero Direct Emissions
Qianan Tengzi 2nd Phase is a wind power plant producing approximately 129 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
China- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.