The Madushan Dam stands out in the energy sector of China as the 1193rd largest power generation facility, with a commendable capacity of 240 MW. This hydro plant contributes only 0.01% to the national energy capacity of 1,603,494 MW, indicating a small yet valuable role in a landscape dominated by coal. While it ranks 204th among the 1000 hydro plants in the country, its location plays a pivotal role in supporting the local energy grid. The Madushan Dam is in proximity to several smaller hydro facilities, such as the Yunnan Fengchunling 3rd Level Small Plant, which has a capacity of 12 MW, and the Yunnan Mangtie River Second Stage, also at 12 MW. This clustering of plants enhances regional energy reliability and showcases the potential for hydroelectric power in Yunnan Province. The facility employs advanced hydroelectric technology, harnessing the natural flow of water to generate electricity efficiently. In the context of China's energy profile, hydroelectric power serves as a vital complement to the predominantly coal-based energy system, helping to reduce carbon emissions and promote sustainability. While the Madushan Dam's capacity is modest compared to larger facilities, its existence reflects the nation's commitment to diversifying its energy sources. The operator of this dam is a local authority that has been pivotal in advancing renewable energy initiatives in the region. As the global energy landscape evolves, the Madushan Dam is poised to play a critical role in Yunnan’s transition toward a more sustainable energy future, offering a glimpse into the potential of hydro power in reducing reliance on fossil fuels.
16 years old
China, Asia
- 1,194. largest of 4,431 plants in China
- #6,800 worldwide by installed capacity
- #1,273 of 8,493 Hydroelectric plants worldwide
- 0.01% of the installed capacity of China
16 years in operation
Hydroelectric fleet average: 42.1 years
China Three Gorges Corporation operates 508 plants totalling 127,392 MW
30 plants within 100 km, 2,229 MW combined
Nearest plant: Yunnan Fengchunling 3rd Level Small (11.7 km)
Source: Industry About
Location
Zero Direct Emissions
Madushan Dam is a hydro power plant producing approximately 841 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
China- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.