World Power PlantsWorld Power Plants

Inner Mongolia Urad Middle Banner45 MW Wind

WindRenewable

Inner Mongolia Urad Middle Banner is a 45 MW wind power plant in China, operated since its commissioning year is not specified. Ranked #712 of 833 wind plants in China, this facility contributes 0.09% of China's total wind capacity of 50,905 MW. The largest wind plant in China is the Gansu Wind Farm at 6,000 MW, making Inner Mongolia Urad Middle Banner 133.3 times smaller. Nearby plants include Huadian Inner Mongolia Guyang Hongnijing (49 MW, Wind), Inner Mongolia Jinjie Baiyun Phase 1 (49 MW, Wind), and Baiyun Ebo Inner Mongolia Luneng Phase 2 (49 MW, Wind). The facility is located in Inner Mongolia, approximately 300 km from Hohhot.

Capacity
45 MW
Commissioning Year
2016

10 years old

Owner
China Three Gorges Corporation
Location
41.6778°, 109.9572°

China, Asia

Location
Coordinates:: 41.677800, 109.957200
Open in Google Maps
Technical Details
Primary Fuel Type
Wind
Energy Source
Renewable
Country
China
Continent
Asia
Data Source
Global Power Plant Database
ChinaEnergy Profile
4,431
Total Plants
1617.1 GW
Total Capacity
CoalHydroNuclearGas
Top Fuels
Understanding Wind Power Generation: A Comprehensive Overview

Wind power generation harnesses the kinetic energy of wind to produce electricity, making it one of the fastest-growing renewable energy sources globally. This process begins with wind turbines, which consist of large blades mounted on a tower. As the wind blows, it causes the blades to rotate, transforming the wind's kinetic energy into mechanical energy. This mechanical energy is then converted into electrical energy through a generator connected to the turbine. The efficiency of wind turbines has significantly improved over the past decades, with modern designs capable of generating power even at low wind speeds.

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.