Datang Qingyuan Phase 2 Wind is a 34 MW wind power plant in China, operational since its commissioning. Ranked #753 of 833 wind plants in China, this plant accounts for 0.07% of China's total wind capacity of 50,905 MW. The largest wind plant in China is Gansu Wind Farm at 6,000 MW, making Datang Qingyuan Phase 2 Wind 176.5 times smaller. Nearby plants include Shanxi Zhaoguang Phase 1 (1,800 MW, Coal) and Huozhou power station (1,200 MW, Coal). The facility is located in Shanxi Province, approximately 300 km from Taiyuan.
11 years old
China, Asia
- 2,771. largest of 4,431 plants in China
- #15,973 worldwide by installed capacity
- #2,347 of 5,731 Wind plants worldwide
11 years in operation
Wind fleet average: 14.4 years
Datang International Power Generation Company operates 10 plants totalling 5,500 MW
16 plants within 100 km, 11,799 MW combined
Source: UNFCCC CDM Registry
Location
Zero Direct Emissions
Datang Qingyuan Phase 2 Wind is a wind power plant producing approximately 89 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
China- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.