Renascença II is a 30 MW wind power plant in Brazil, commissioned in 2014. It is part of a local wind energy project and contributes 0.27% of Brazil's total wind capacity of 11,309 MW across 410 plants. Ranked #49 of 410 wind plants in Brazil, Renascença II's 30 MW is a small portion of the country's wind energy production. The largest wind plant in Brazil is Campos Neutrais Wind Farm at 583 MW, making Renascença II 19.4 times smaller. Nearby plants within 50 km include Rei dos Ventos 3 (60.12 MW, Wind) and Rei dos Ventos 1 (58.45 MW, Wind). The facility is located in the state of Rio Grande do Norte, approximately 200 km from the city of Natal.
12 years old
Brazil, South America
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Brazil- Continent
- South America
- Data Source
- Global Power Plant Database
Wind power generation harnesses the kinetic energy of wind to produce electricity, making it one of the fastest-growing renewable energy sources globally. This process begins with wind turbines, which consist of large blades mounted on a tower. As the wind blows, it causes the blades to rotate, transforming the wind's kinetic energy into mechanical energy. This mechanical energy is then converted into electrical energy through a generator connected to the turbine. The efficiency of wind turbines has significantly improved over the past decades, with modern designs capable of generating power even at low wind speeds.
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.