Klabin Correia Pinto (Antiga Celucat)— 37.882 MW Biomass
Klabin Correia Pinto (Antiga Celucat) is a 37.882 MW biomass power plant in Brazil, commissioned in 1969. Ranked #123 of 425 biomass plants in Brazil. Its 37.882 MW represents 0.3% of Brazil's total biomass capacity of 12,644 MW. The largest biomass plant in Brazil is Klabin Celulose at 330 MW, making Klabin Correia Pinto 8.7 times smaller. Nearby plants within 50 km include Pery (30 MW, Hydro), João Borges (18.99 MW, Hydro), and Santa Rosa (6.5 MW, Hydro). The facility is located in Santa Catarina, approximately 400 km southwest of Curitiba.
57 years old
Brazil, South America
- 463. largest of 2,402 plants in Brazil
- #15,558 worldwide by installed capacity
- #304 of 1,487 Biomass plants worldwide
- 0.02% of the installed capacity of Brazil
57 years in operation
Biomass fleet average: 20.5 years
Klabin S.A. operates 2 plants totalling 368 MW
19 plants within 100 km, 1,876 MW combined
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
Brazil- Continent
- South America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.