Ranked as the 25th largest power generation facility in Austria, Vermuntwerk plays a crucial role in the country’s energy landscape, contributing 1.40% of the national capacity. With a generation capacity of 157 MW, it stands as the 22nd largest hydro plant among Austria's 96 hydro facilities. This impressive ranking highlights its importance in a nation where hydroelectric power dominates, accounting for a significant portion of the total 11,227 MW capacity spread across 103 plants. Vermuntwerk utilizes state-of-the-art hydroelectric technology, harnessing the kinetic energy of flowing water to produce electricity. This facility is not only pivotal for local energy supply but also exemplifies the efficiency and reliability associated with hydro power generation. Its strategic location allows it to effectively contribute to the stability of the regional grid, ensuring that energy demands are met consistently. In the surrounding area, several other notable hydro plants enhance the regional energy profile. Kopswerk II, with a capacity of 525 MW, is the largest nearby facility, followed by Pradella (300 MW), Rodundwerk II (295 MW), Lünerseewerk (280 MW), and Kopswerk I (247 MW). This cluster of hydroelectric facilities underscores the region's reliance on renewable energy sources and positions it as a hub for hydro power generation in Austria. The combined output of these plants not only bolsters energy security in Vorarlberg but also supports Austria's commitment to sustainable energy practices. On a national scale, Austria's energy landscape is heavily dominated by hydroelectric power, which remains the leading fuel type. The presence of plants like Vermuntwerk is vital in maintaining this dominance, as it complements the intermittent nature of other renewable sources while providing a stable output. With a total capacity of 11,227 MW, the average capacity of power plants in Austria stands at approximately 109 MW, making Vermuntwerk's capacity above average for the region. Operated by Vorarlberge Illwerke AG, Vermuntwerk was commissioned in 1969 and has been contributing to the energy needs of the area for over five decades. As Austria continues to transition towards a more sustainable energy future, the significance of hydroelectric facilities like Vermuntwerk cannot be overstated. Its ability to generate clean, renewable energy while supporting both the local and national grids positions it as a cornerstone of Austria's energy strategy, paving the way for further advancements in renewable energy generation.
21 years old
Austria, Europe
- 25. largest of 103 plants in Austria
- #8,237 worldwide by installed capacity
- #1,728 of 8,493 Hydroelectric plants worldwide
- 1.4% of the installed capacity of Austria
21 years in operation
Hydroelectric fleet average: 42.1 years
Vorarlberge Illwerke AG operates 7 plants totalling 1,571 MW
81 plants within 100 km, 10,034 MW combined
Source: Vorarlberger Illwerke AG
Location
Zero Direct Emissions
Vermuntwerk is a hydro power plant producing approximately 550 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Austria- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.