World Power Plants

Kreuzeck days storage45 MW Hydroelectric

HydroRenewable

Kreuzeck days storage is a 45 MW hydro power plant in Austria, operated by Verbund and commissioned in 1960. Ranked #41 of 96 hydro plants in Austria, it represents 0.5% of the country's total hydro capacity of 9,072 MW. The largest hydro plant in Austria is Malta main stage at 730 MW, making Kreuzeck days storage 16.2 times smaller. Nearby plants include Malta main stage (730 MW, Hydro), Malta Secondary school (120 MW, Hydro), and Schwarzach (120 MW, Hydro). The facility is located in Carinthia, approximately 90 km south of Salzburg.

Capacity
45 MW
Commissioning Year
1960

66 years old

Owner
Verbund
Location
46.8727°, 13.3117°

Austria, Europe

Context & rankings
  • 44. largest of 103 plants in Austria
  • #14,641 worldwide by installed capacity
  • #3,296 of 8,493 Hydroelectric plants worldwide
  • 0.4% of the installed capacity of Austria
Age & fleet comparison

66 years in operation

Hydroelectric fleet average: 42.1 years

Operator portfolio

Verbund operates 83 plants totalling 5,930 MW

Regional density

33 plants within 100 km, 2,769 MW combined

Nearest plant: Feldkirchen (2.1 km)

Data provenance

Source: Verbund

Location

Coordinates:: 46.872700, 13.311700
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Kreuzeck days storage is a hydro power plant producing approximately 158 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Hydro
Energy Source
Renewable
Country
Austria
Continent
Europe
Data Source
Global Power Plant Database

AustriaEnergy Profile

103
Total Plants
11.2 GW
Total Capacity
HydroGasWind
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.