Planta Hidroeléctrica Planicie Banderita472 MW Hydroelectric

HydroRenewableVerified: Feb 2026

Planta Hidroeléctrica Planicie Banderita, situated in Argentina, is a hydroelectric power generation facility with a capacity of 472 MW. Operated by Duke Energy S.A., this plant plays a crucial role in Argentina's energy matrix, providing clean and renewable electricity to the national grid. Located at coordinates -38.5596, -68.4746, the facility is strategically positioned to harness the natural water flows of the surrounding rivers, converting them into energy through hydroelectric technology. This not only supports Argentina's commitment to increasing its renewable energy share but also enhances energy security for local communities. The importance of this facility is amplified within the context of Argentina's energy policies, which are increasingly focusing on sustainable development and reducing reliance on fossil fuels. By utilizing the hydro power potential, Planta Hidroeléctrica Planicie Banderita contributes to a more resilient and environmentally friendly energy future, supporting the country's goals for sustainability and energy independence.

Capacity
472 MW
Commissioning Year
2010

16 years old

Owner
Duke Energy S.A.
Location
-38.5596°, -68.4746°

Argentina, South America

Context & rankings
  • 49. largest of 368 plants in Argentina
  • #4,823 worldwide by installed capacity
  • #766 of 8,493 Hydroelectric plants worldwide
  • 0.67% of the installed capacity of Argentina
Age & fleet comparison

16 years in operation

Hydroelectric fleet average: 42.1 years

Operator portfolio

Duke Energy S.A. operates 1 plants totalling 472 MW

Regional density

17 plants within 100 km, 5,611 MW combined

Nearest plant: Central Térmica Loma de la Lata (12.4 km)

Data provenance

Location

Coordinates:: -38.559591, -68.474552
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Planta Hidroeléctrica Planicie Banderita is a hydro power plant producing approximately 1654 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Hydro
Energy Source
Renewable
Country
Argentina
Continent
South America
Data Source
Global Power Plant Database

Overview of Planta Hidroeléctrica Planicie Banderita in Argentina

Planta Hidroeléctrica Planicie Banderita is a significant hydroelectric power plant located in Argentina, with a total capacity of 472 megawatts (MW). Owned by Duke Energy S.A., this facility plays a crucial role in the country's energy sector by providing a substantial portion of the renewable energy necessary to meet Argentina's growing electricity demand. As a hydroelectric power plant, Planicie Banderita harnesses the potential energy of flowing water to generate electricity, thereby contributing to a more sustainable energy mix in a country that has traditionally relied on fossil fuels. The plant's operation is based on the principle of hydropower, which involves converting the kinetic energy of water flowing through turbines into electrical energy. This method of electricity generation is not only renewable but also has a lower carbon footprint compared to conventional electricity generation methods that rely on coal or natural gas. The use of hydroelectric power is particularly advantageous in Argentina, given its extensive river systems and mountainous terrain, which provide ample opportunities for such installations. From an environmental perspective, hydroelectric plants like Planicie Banderita are generally considered to be more eco-friendly than their fossil-fuel counterparts. They produce no direct greenhouse gas emissions during operation, thus helping to mitigate climate change. However, it is important to acknowledge that the construction and operation of hydroelectric dams can impact local ecosystems, including fish migration patterns and aquatic habitats. Careful environmental management practices are essential to minimize these impacts and enhance the sustainability of hydroelectric projects. Regionally, Planta Hidroeléctrica Planicie Banderita is significant for its contribution to local economies and its ability to provide stable, renewable energy to both urban and rural areas. The plant not only supplies electricity to the national grid but also supports local jobs and industries related to power generation and maintenance. By bolstering the energy supply, it helps to foster economic growth and development in the surrounding communities. Additionally, the presence of a large hydroelectric facility can promote tourism and recreational activities in the area, particularly for those interested in nature and outdoor sports. In summary, Planta Hidroeléctrica Planicie Banderita represents an important asset in Argentina's pursuit of a more sustainable energy future. By leveraging hydroelectric power, the plant contributes to reducing reliance on fossil fuels, supports local economies, and exemplifies the potential of renewable energy sources in addressing the challenges of climate change.

ArgentinaEnergy Profile

368
Total Plants
70.2 GW
Total Capacity
HydroGasCoalNuclear
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.