PIEDRAS MORAS is a 6.3 MW hydro power plant in Argentina, operated by EPEC since 1995. Ranked #99 of 111 hydro plants in Argentina. Its 6.3 MW represents 0.02% of Argentina's total hydro capacity of 30,334 MW. The largest hydro plant in Argentina is Corpus Christi Dam at 3,800 MW, making PIEDRAS MORAS 603.2 times smaller. Nearby plants within 50 km include Central Hidroeléctrica Río Grande (750 MW, Hydro), Rio Grande Hydroelectric Complex (750 MW, Hydro), and EMBALSE (648 MW, Nuclear). The facility is located in Córdoba Province, approximately 150 km from Córdoba City.
31 years old
Argentina, South America
- 287. largest of 368 plants in Argentina
- #27,162 worldwide by installed capacity
- #6,149 of 8,493 Hydroelectric plants worldwide
- 0.01% of the installed capacity of Argentina
31 years in operation
Hydroelectric fleet average: 42.1 years
EPEC operates 28 plants totalling 2,983 MW
34 plants within 100 km, 6,850 MW combined
Source: Ministerio de Energía y Minería
Location
Zero Direct Emissions
PIEDRAS MORAS is a hydro power plant producing approximately 22 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Argentina- Continent
- South America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.