World Power Plants

Central Hidroeléctrica Cuesta del Viento10.8 MW Hydroelectric

HydroRenewableVerified: Feb 2026

Central Hidroeléctrica Cuesta del Viento is a 10.8 MW hydro power plant in Argentina, operated by EPSE. Ranked #90 of 111 hydro plants in Argentina, it contributes 0.04% of the country's total hydro capacity of 30,334 MW. The largest hydro plant in Argentina is Corpus Christi Dam at 3,800 MW, making Central Hidroeléctrica Cuesta del Viento 351 times smaller. Nearby plants include Iglesia-Guañizuil (80 MW, Solar) and CUESTA DEL VIENTO (10.55 MW, Hydro). The facility is located in San Juan Province, approximately 200 km northeast of Mendoza.

Capacity
10.8 MW
Commissioning Year
2010

16 years old

Owner
EPSE
Location
-30.1960°, -69.0625°

Argentina, South America

Context & rankings
  • 267. largest of 368 plants in Argentina
  • #23,415 worldwide by installed capacity
  • #5,400 of 8,493 Hydroelectric plants worldwide
  • 0.02% of the installed capacity of Argentina
Age & fleet comparison

16 years in operation

Hydroelectric fleet average: 42.1 years

Operator portfolio

EPSE operates 2 plants totalling 12 MW

Regional density

3 plants within 100 km, 101 MW combined

Nearest plant: Cuesta del Viento Dam (1.5 km)

Data provenance

Location

Coordinates:: -30.196047, -69.062534
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Central Hidroeléctrica Cuesta del Viento is a hydro power plant producing approximately 38 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Hydro
Energy Source
Renewable
Country
Argentina
Continent
South America
Data Source
Global Power Plant Database

ArgentinaEnergy Profile

368
Total Plants
70.2 GW
Total Capacity
HydroGasCoalNuclear
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.