Marsat TG holds the position of the 27th largest power generation facility in Algeria, with a capacity of 184 MW. As a gas-fired plant, it represents a key player in Algeria's energy mix, where natural gas is the dominant fuel among the 59 total facilities, contributing to a national capacity of 18,000 MW. Marsat TG's output accounts for approximately 1.02% of the country's total capacity, highlighting its significance in the Algerian electricity sector. This facility employs gas turbine technology, which is known for its efficiency and flexibility in meeting fluctuating energy demands. In the vicinity of Marsat TG, other notable plants include Marsat, with a substantial capacity of 1,024 MW, and Kahrama IPP, which generates 345 MW. This regional cluster of gas facilities not only enhances the reliability of power supply but also underscores the importance of natural gas in Algeria's energy strategy. Algeria's energy profile is characterized by a heavy reliance on fossil fuels, particularly natural gas, which dominates the electricity generation landscape. Marsat TG plays a crucial role in supporting the national grid, especially as the country seeks to improve its energy infrastructure and expand access to electricity. With a significant number of gas plants in operation, Algeria is positioned to meet both domestic demands and export opportunities in the region. Operated by Sonelgaz Production de l’Electricité, Marsat TG has been a part of the national energy framework for enhancing electricity generation since its commissioning. The facility exemplifies the country’s strategic focus on leveraging its natural gas resources to ensure energy security and economic stability. Looking towards the future, Marsat TG will continue to be a vital component of Algeria's efforts to diversify its energy portfolio while maintaining a strong foundation in gas-based generation. As the nation navigates the transition to a more sustainable energy future, the plant will play an integral role in balancing energy demands and supporting economic growth.

Capacity
184 MW
Commissioning Year
1998

28 years old

Owner
Sonelgaz Production de l’Electricite
Location
35.8000°, -0.1924°

Algeria, Africa

Context & rankings
  • 27. largest of 59 plants in Algeria
  • #7,727 worldwide by installed capacity
  • #2,716 of 5,146 Natural Gas plants worldwide
  • 1.02% of the installed capacity of Algeria
Age & fleet comparison

28 years in operation

Natural Gas fleet average: 26.9 years

Operator portfolio

Sonelgaz Production de l’Electricite operates 4 plants totalling 1,874 MW

Regional density

5 plants within 100 km, 2,357 MW combined

Nearest plant: Kahrama IPP (5 km)

Data provenance

Location

Coordinates:: 35.800000, -0.192400
Open in Google Maps
Carbon Footprint490 g CO₂/kWh
Annual CO₂
355.4 Kt
725 GWh/year × 490 g/kWh
Cumulative CO₂
9.95 Mt
Over 28 years of operation
Closing Soon
2028
2 years remaining
Annual emissions equivalent to
77.3K
cars per year
47.4K
homes per year
16.2M
trees to offset

Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Gas
Energy Source
Non-Renewable
Country
Algeria
Continent
Africa
Data Source
Global Power Plant Database

AlgeriaEnergy Profile

59
Total Plants
18.0 GW
Total Capacity
GasSolarHydro
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.